Town and Country Planning

Aberdeen CityAB10 1HF57.146867-2.098833AB11 6BH57.146102-2.099773AB11 6DJ57.142764-2.106341AB15 4YQ57.140539-2.1408842025-10-152025-10-17TSO (The Stationery Office), customer.services@thegazette.co.uk498024229184

Aberdeen City Council

THE PLANNING (LISTED BUILDING CONSENT AND CONSERVATION AREA CONSENT PROCEDURE) (SCOTLAND) REGULATIONS 2015

LISTED BUILDING CONSENT REGULATION (8)(1)(A) – 21 DAYS FROM THE DATE OF THIS NOTICE

The applications listed below together with the plans, drawings and other documents submitted with them may be viewed online by entering the reference number at https://publicaccess.aberdeencity.gov.uk/online-applications/. Representations may be submitted to the Chief Officer – Strategic Place Planning online via the above website link or to pi@aberdeencity.gov.uk (quoting the application reference number). Representations must be received within the time period specified under each of the categories. Subject to personal data being removed, representations will be open to public viewing.

David Dunne

Chief Officer - Strategic Place Planning

Proposal/Reference

251099/LBC

Proposal/Site Address

Apartment 3, 86 Queen's Road Aberdeen AB15 4YQ

Name and Address of Applicant

Ms Kirsten Anne Airnes

Description of Proposal

Erection of single storey orangery to rear

Proposal/Reference

251102/LBC

Proposal/Site Address

117 Union Street Aberdeen AB11 6BH

Name and Address of Applicant

Consultants Limited Main

Description of Proposal

Maintenance works to the roof and high level windows and associated works

Proposal/Reference

251085/LBC

Proposal/Site Address

7 St Nicholas Lane Aberdeen AB10 1HF

Name and Address of Applicant

Greene King

Description of Proposal

Internal alterations including structural floor repairs, toilet fit-out and roof repair with all associated works

Proposal/Reference

251083/LBC

Proposal/Site Address

15 Bon-accord Square Aberdeen AB11 6DJ

Name and Address of Applicant

Bowden Developments Ltd

Description of Proposal

Internal alterations to partitions and doors, formation of tea prep area and toilet, removal of raised stage, installation of steel stair and all associated works