Road Traffic Acts
ROYAL BOROUGH OF GREENWICH
ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)
TEMPORARY ROAD CLOSURES FOR STRATEGIC CYCLE ROUTE GREENWICH TO WOOLWICH AND CARRIAGEWAY WORKS
1. NOTICE IS HEREBY GIVEN that the Council of the Royal Borough of Greenwich has made an Order to accommodate closures for the strategic cycle route Greenwich to Woolwich and carriageway works under Section 14(1) of the Road Traffic Regulation Act 1984.
2. The effect of the Order will be to temporarily:
a) Prohibit vehicles from entering, exiting, proceeding or waiting (including waiting for the purposes of loading or unloading) in the roads or lengths of road specified in the Schedule to this Notice.
b) Prohibit vehicles from entering, exiting, proceeding or waiting (including waiting for the purposes of loading or unloading) in the following lengths of road for one night closures:
a. Whitworth Street, from its junction with Pelton Street to its junction with Trafalgar Road.
b. Colomb Street, from its junction with Pelton Road to its junction with Trafalgar Road.
c. Hatcliffe Street, for its entire extent.
d. Commerell Place, for its entire extent.
e. Armitage Road, for its entire extent.
f. Denford Street, for its entire extent.
g. Fignal Street, for its entire extent.
h. Denham Street, for its entire extent.
i. Aldeburgh Street, for its entire extent.
j. Feltram Way, for its entire extent.
k. Holmwood Villas, for its entire extent.
l. Ramac Way, for its entire extent.
m. Unnamed side road adjacent to 369 Woolwich Road, for its entire extent.
c) Suspend the parking bays adjacent to Commerell Place.
3. The above restrictions would only apply at such times and to such extent as shall be indicated by the placing or covering of the appropriate traffic signs.
4. Whilst the closures are in operation, vehicular access to properties affected by these works would be maintained wherever possible subject to the extent and operations of the works. Alternative routes for diverted vehicles would be available via local roads and would be indicated via local signage, also indicated in column 3 of the table in the Schedule to this Notice.
5. The Order would come into force on 29th June 2022 and would continue in force for up to 18 months, or until the works have been completed, whichever is the sooner. The works and suspensions would be conducted on a ‘rolling’ programme and, as such, not all the restrictions stated in paragraph 2 would be in force in all the effected roads.
6. Queries concerning these works should be directed to traffic.team@royalgreenwich.gov.uk quoting reference 06-22 Cycle Route Extensions.
Assistant Director, Transport, Communities, Environment and Central, Royal Borough of Greenwich
Dated 29th June 2022
SCHEDULE – Scheduled Road and Lane Closures
1. Roads or Lengths of Road | 2. Expected Duration of Works subject to change | 3. Alternative Routes |
Christchurch Way, west side cycle lane, from its junction with Trafalgar Road in a northerly direction for its entire extent. | 6 days | Via Christchurch Way west side carriageway |
Trafalgar Road, north side cycle lane, partial closure of lanes from a point 12 metres west to a point 51 metres east of its junction with Christchurch Way. | 11 days | Via Trafalgar Road, north side single file cycle lane |
Trafalgar Road, north side, from a point 26 metres west to a point 21 metres east of its junction with Christchurch Way. | 8 days | Via Trafalgar Road, south side carriageway |
Christchurch Way, both sides, from its junction with Trafalgar Road in a northerly direction for 12 metres. | 3 days |
Via Christchurch Way, Azof Street, Blackwall Lane, Trafalgar Road and vice versa. Or via Christchurch Way, Mauritius Road, Blackwall Lane, Trafalgar Road and vice versa. |
Trafalgar Road, north side cycle lane, from a point 12.5 metres west to a point 21 metres east of its junction with Christchurch Way. | 3 days | Via Trafalgar Road, north side carriageway |
Trafalgar Road, north side cycle lane, partial closure of lanes from a point 21.5 metres west of its junction with Whitworth Street to a point 27 metres east of its junction with Colomb Street. | 15 days at all times | Via Trafalgar Road, north side single file cycle lane and footpath |
Trafalgar Road, north side, from its junction with Whitworth Street to a point 27 metres east of its junction with Colomb Street. | 2 days overnight | Via Trafalgar Road, south side carriageway |
Woolwich Road, north side, northernmost lane closure from its junction with Hatcliffe Street for a distance of 10 metres in a westerly direction. | 2 days overnight | Via Woolwich Road, north side, southernmost lane |
Colomb Street, west side, from its junction with Trafalgar Road for a distance of 7 metres in a southerly direction. | 2 days overnight | Via Colomb Street, Walnut Tree Road and Vanbrugh Hill |
Colomb Street, both sides, from its junction with Trafalgar Road for a distance of 8.5 metres in a northerly direction. | 2 days overnight | Via Pelton Road and Christchurch Way |
Trafalgar Road, north side cycle lane, from its junction with Whitworth Street to a point 27 metres east of its junction with Colomb Street. | 2 days overnight | Via Trafalgar Road, north side carriageway |
Woolwich Road, north side, from its junction with Armitage Road for a distance of 26.5 metres in an easterly direction. | 1 day at all times | Via Woolwich Road, south side carriageway |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Armitage Road for a distance of 56.5 metres in an easterly direction | 1 day at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Commerell Place to a point 56.5 metres east of its junction with Armitage Road. | 6 days at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side, from a point 18.5 metres west of its junction with Commerell Place to its junction with Armitage Road. | 6 days at all times | Via Woolwich Road, south side carriageway |
Woolwich Road, north side, partial closure of lane from its junction with Armitage Road for a distance of 30 metres in an easterly direction. | 6 days at all times | |
Armitage Road, west side, partial closure of lane from its junction with Woolwich Road for a distance of 6 metres in a northerly direction. | 6 days at all times | |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 6 metres east of its junction with Commerell Place to a point 56.5 metres east of its junction with Armitage Road | 6 days at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side, from a point 23 metres west of its junction with Commerell Place to a point 25 metres east of its junction with Armitage Road. | 5 days at all times | Via Woolwich Road, south side carriageway |
Armitage Road, both sides, from its junction with Woolwich Road for a distance of 6 metres in a northerly direction. | 5 days at all times | Via Armitage Road and Commerell Place |
Woolwich Road, north side cycle lane, from its junction with Commerell Place to a point 56.5 metres east of its junction with Armitage Road. | 5 days at all times | Via Woolwich Road, north side carriageway and single file cycle lane |
Marlton Street, west side, from its junction with Woolwich Road for a distance of 14 metres in a northerly direction. | 18 days | Via Marlton Street, east side carriageway |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Denford Street to its junction with Marlton Street. | 18 days | Via Woolwich Road, north side single file cycle lane |
Marlton Street, west side, partial lane closure from its junction with Woolwich Road for a distance of 4.5 metres in a northerly direction. | 24 days | Via Marlton Street, central carriageway |
Marlton Street, east side, partial lane closure from its junction with Woolwich Road for a distance of 16.5 metres in a northerly direction. | 12 days | Via Marlton Street, central carriagew |
Chilver Street, west side, from its junction with Woolwich Road for a distance of 10.5 metres in a northerly direction. | 12 days | Via Chilver Street, east side carriageway |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Denford Street to a point 48 metres east of its junction with Chilver Street. | 24 days | Via Woolwich Road, north side single file cycle lane |
Chilver Street, east side, from its junction with Woolwich Road for a distance of 23.5 metres in a northerly direction. | 12 days at all times | Via Chilver Street, west side carriageway |
Woolwich Road, north side, from a point 10.5 metres west of its junction with Fingal Street to its junction with Marlton Street. | 18 days at all times | Via Woolwich Road, south side carriageway |
Marlton Street, west side, from its junction with Woolwich Road for a distance of 10.5 metres in a northerly direction. | 18 days at all times | Via Marlton Street, east side carriageway |
Woolwich Road, north side cycle lane, from a point 10.5 metres west of its junction with Fingal Street to a point 60 metres east of its junction with Chilver Street. | 18 days at all times | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side, from its junction with Marlton Street to a point 10.5 metres east of its junction with Chilver Street. | 12 days at all times | Via Woolwich Road, south side carriageway |
Marlton Street, east side, partial closure from its junction with Woolwich Road for a distance of 12.5 metres in a northerly direction. | 12 days at all times | |
Chilver Street, west side, partial closure from its junction with Woolwich Road for a distance of 10.5 metres in a northerly direction. | 12 days at all times | Via Chilver Street, central carriageway |
Chilver Street, east side, partial closure from its junction with Woolwich Road for a distance of 14.5 metres in a northerly direction. | 12 days at all times and 4 days overnight | Via Chilver Street, central carriageway |
Woolwich Road, north side cycle lane, from its junction with Marlton Street to a point 11 metres west of its junction with Denham Street. | 12 days at all times | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side, from a point 9.5 metres west of its junction with Fignal Street to a point 27 metres east of its junction with Chilver Street. | 6 days overnight | Via Woolwich Road, south side carriageway |
Marlton Street, west side, partial closure from its junction with Woolwich Road for a distance of 9.5 metres in a northerly direction. | 4 days overnight | Via Marlton Street, east side carriageway |
Marlton Street, east side, partial closure from its junction with Woolwich Road for a distance of 12.5 metres in a northerly direction. | 4 days overnight | Via Marlton Street, central carriageway |
Chilver Street, west side, partial closure from its junction with Woolwich Road for a distance of 7 metres in a northerly direction. | 4 days overnight | Via Chilver Street, central carriageway |
Woolwich Road, north side cycle lane, from a point 9.5 metres west of its junction with Fignal Street to a point 27 metres east of its junction with Chilver Street. | 4 days overnight | Via Woolwich Road, north side carriageway |
Marlton Street, both sides, from its junction with Woolwich Road for a distance of 8 metres in a northerly direction (except for residential access to properties). | 2 days overnight | |
Chilver Street, both sides, from its junction with Woolwich Road for a distance of 7.5 metres in a northerly direction (except for residential access to properties). | 2 days overnight | |
Woolwich Road, north side cycle lane, from a point 9.5 metres west of its junction with Fingal Street to a point 60 metres east of its junction with Chilver Street. | 2 days overnight | Via Woolwich Road, north side carriageway and single file cycle lane |
Denham Street, both sides, partial lane closures from its junction with Woolwich Road for a distance of 10 metres in a northerly direction. | 8 days at all times | Via Denham Street, central carriageway |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 37 metres west to a point 17.5 metres east of its junction with Denham Street. | 8 days at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Denham Street for a distance of 78 metres in an easterly direction. | 18 days at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Tunnel Avenue for a distance of 59.5 metres in a westerly direction. | 18 days at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side, from a point 29 metres west to a point 23 metres east of its junction with Denham Street. | 8 days at all times | Via Woolwich Road, south side carriageway |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 7 metres west to a point 31 metres east of its junction with Denham Street. | 8 days at all times | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side, from a point 29 metres west of its junction with Denham Street to its junction with Kemsing Road. | 12 days at all times and 3 days overnight | Via Woolwich Road, south side carriageway |
Woolwich Road, north side northernmost lane, from its junction with Kemsing Road for a distance of 33 metres in an easterly direction. | 12 days at all times and 3 days overnight | Via Woolwich Road, north side southernmost lane |
Woolwich Road, central carriageway, from a point 15.5 metres west of its junction with Tunnel Avenue for a distance of 22.5 metres in a westerly direction. | 12 days at all times and 3 days overnight | |
Kemsing Road, west side, from its junction with Woolwich Road for a distance of 6 metres in a southerly direction. | 12 days at all times and 3 days overnight | Via Kemsing Road, Ormiston Road and Combedale Road |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Denham Street to its junction with Tunnel Avenue. | 12 days at all times | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 29 metres west to a point 69 metres east of its junction with Denham Street. | 3 days overnight | Via Woolwich Road, north side carriageway and single file cycle lane |
Woolwich Road, north side cycle lane, from its junction with Tunnel Avenue for a distance of 67 metres in a westerly direction. | 3 days overnight | Via Woolwich Road, north side footpath (pedestrian and cyclists to be marshalled due to pinch point) |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Felltram Way to a point 10 metres east of its junction with Holmwood Villas. | 8 days at all times | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side, from a point 16.5 metres east of its junction with Felltram Way to its junction with Rainton Road. | 1 day overnight | Via Woolwich Road, south side carriageway |
Rainton Road, west side, from its junction with Woolwich Road for a distance of 9 metres in a southerly direction. | 1 day overnight | Via Rainton Road, Gurdon Road and Fairthorn Road |
Rainton Road, west side, from its junction with Gurdon Road to a point 9 metres south of its junction with Woolwich Road (except access). | 1 day overnight | Via Gurdon Road and Fairthorn Road |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 16 metres west of its junction with Felltram Way to its junction with Holmwood Villas. | 1 day overnight | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 12 metres east of its junction with Victoria Way for a distance of 87 metres in an easterly direction. | 14 days at all times | Via Woolwich Road, north side single file cycle lane |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 1.5 metres east of a point opposite the western boundary of 296 Woolwich Road to a point 2 metres east of the common boundary of Nos. 332 and 334 Woolwich Road. | 8 days at all times | Via Woolwich Road, north side single file cycle lane and footpath |
Woolwich Road, north side, from the common boundary of Nos. 320 and 322 Woolwich Road for a distance of 55 metres in a westerly direction. | 1 day overnight | Via Woolwich Road, south side carriageway |
Rathmore Road, west side, from its junction with Woolwich Road for a distance of 8 metres in a southerly direction. | 1 day overnight | Via Troughton Road and Victoria Way |
Rathmore Road, west side, from its junction with Troughton Road to a point 8 metres south of its junction with Woolwich Road (except access) | 1 day overnight | Via Troughton Road and Victoria Way |
Woolwich Road, north side cycle lane, partial closure of lanes from a point 39.5 metres east of its junction with Victoria Way to a point 2 metres east of the common boundary of Nos. 332 and 334 Woolwich Road. | 1 day overnight | Via Woolwich Road, north side single file cycle lane and footpath |
Gallions Road, west side, from its junction with Woolwich Road for a distance of 4 metres in a northerly direction. | 3 days at all times | |
Woolwich Road, north side cycle lane, partial closure of lanes from its junction with Gallions Road for a distance of 19 metres in a westerly direction. | 3 days at all times | Via Woolwich Road, north side single file cycle lane |
A206, both sides, from its junction with Anchor & Hope Lane to its junction with Blackwall Tunnel Southern Approach. | 5 days overnight | Via Blackwall Tunnel Southern Approach, Peartree Way, Bugsby’s Way, Anchor & Hope Lane and Vice Versa |
A206, eastbound and westbound bus lanes, between its junction with Anchor & Hope Lane and its junction with John Wilson Street. | 5 days at all times | Via A206 eastbound and westbound carriageway |
[Note: For the following roads, part of the carriageway will be closed for the duration specified, two-way traffic will be maintained but controlled by temporary traffic signals:
1. Trafalgar Road, both sides, for 8 days, between a point 26 metres west and a point 21 metres east of its junction with Christchurch Way;
2. Trafalgar Road, both sides, for 2 days overnight, between its junction with Whitworth Street and its junction with Blackwall Lane and Vanbrugh Hill;
3. Woolwich Road, both sides, 1 day at all times, between its junction with Armitage Road and a point 37 metres east of its junction with Armitage Road;
4. Woolwich Road, both sides, 5 days at all times, between a point 23 metres west of its junction with Commerell Place to a point 56.5 metres east of its junction with Armitage Road;
5. Woolwich Road, both sides 18 days at all times, between a point 10.5 metres west of its junction with Fingal Street to its junction with Marlton Street;
6. Woolwich Road, both sides, 12 days at all time, between its junction with Marlton Street and a point 11.5 metres east of its junction with Chilver Street.
7. Woolwich Road, both sides, 6 days overnight, between a point 9.5 metres west of its junction with Fignal Street to a point 32.5 metres east of its junction with Chilver Street;
8. Woolwich Road, both sides, 8 days at all times, from a point 29 metres west to a point 38.5 metres east of its junction with Denham Street;
9. Woolwich Road, both sides, 12 days at all times and 3 days overnight, from a point 29 metres west of its junction with Denham Street to its junction with Tunnel Avenue.
10. Woolwich Road, both sides, 1 day overnight, from a point 12 metres east of its junction with Felltram Way to a point 14.5 metres east of its junction with Holmwood Villas.
11. Woolwich Road, both sides, 1 day overnight, from the common boundary of Nos. 322 and 324 Woolwich Road for a distance of 60.5 metres in a westerly direction.