Town and Country Planning
Aberdeen City Council
TOWN & COUNTRY PLANNING [LISTED BUILDINGS AND BUILDINGS IN CONSERVATION AREAS] [SCOTLAND] REGULATIONS 1987
NOTICE is hereby given that an application for Listed Building/Conservation Area Consent and for Planning Permission with respect to the undernoted subjects, has been submitted to Aberdeen City Council.
The application and relative plans area available for inspection within Planning and Sustainable Development, Planning Reception, Marischal College, Broad Street, Aberdeen, AB10 1AB between the hours of 8.30 am and 5 pm (Mondays to Fridays). Any person wishing to make representations regarding any of the proposals should make them in writing to the above address (quoting the reference number and stating clearly the reasons for those representations). Alternatively, plans can be viewed, and comments made online at www.aberdeencity.gov.uk or by e-mail to pi@aberdeencity.gov.uk
THE PLANNING (LISTED BUILDING CONSENT AND CONSERVATION AREA CONSENT PROCEDURE) (SCOTLAND) REGULATIONS 2015
Listed Building Consent Regulation (8)(1)(a) – 21 days from the date of this notice
Address: The Triple Kirks, Belmont Street, Aberdeen, AB10 1JS
Proposal: Installation of lighting to Spire
Applicant: Miss Natasha Douglas
Ref No: 161059/LBC
Address: 82 Union Street, Aberdeen, AB10 1JL
Proposal: Formation of 1 No.Non Illuminated Fascia Sign and 1 No. Non Illuminated internally applied Vinyl Sign
Applicant: Mr Allan Barclay
Ref No: 161083/LBC
Address: Atholl House, 84-88 Guild Street, Aberdeen, AB11 6LT
Proposal: The application covers the demolition of the existing Atholl House, a new build development to include 413 student bedrooms and a 192 Bed hotel, inclusion of retail to lower ground floor, servicing to concourse level, formation of a new Public Square, including hard and soft landscaping to provide improved public access
Applicant: Atholl Square Developments
Ref No: 161078/LBC
Address: 1 Trinity Quay, Trinity Quay, Aberdeen, AB11 5AA
Proposal: Variation to Listed Building Consent Ref: 131831 to alter stair access and addition of new dormer
Applicant: Davmill Ltd
Ref No: 161095/LBC
Address:The Hamilton School, 55-57 Queen’s Road, Aberdeen, AB15 4YP
Proposal: Formation of new hotel, bar and restaurant including demolition of existing school extension and dwellinghouse (55 Queen’s Lane South), and all associated infrastructure and landscaping works
Applicant: Status Properties Ltd
Ref No: 161020/LBC
Address: 52 Bon-Accord Street, Aberdeen, AB11 6EL
Proposal: Demolition of rear extension, extension of 4 residential flats and four new build flats with associated amenity space
Applicant: Mr David Mitchell
Ref No: 161081/LBC
Address: 15 Bon-Accord Crescent, Aberdeen, AB11 6DE
Proposal: Construction of 11 residential flats with extension to rear of property, additional front dormer and infills to existing building
Applicant: Alan Grant Developments Ltd
Ref No: 161034/LBC
Address: 51 Union Street, Aberdeen, AB11 5BJ
Proposal: Formation of 1 No.Illuminated Projecting Sign, 1 Non-Illuminated Fascia Sign and 1 No. Window Graphic sign
Applicant: Miss Emma Henderson
Ref No: 161082/LBC
Address: 1 Union Bridge, Union Street, Aberdeen, AB11 6BG
Proposal: The height of the existing parapet design is to be increased, centrally an additional parapet structure is proposed consisting of curved structural lampposts, posts & spars with horizontal stainless steel wire infill
Applicant: Ms Nathalie Giret
Ref No: 161039/LBC
Conservation Area Consent
Regulation (8)(1)(b) – 21 days from the date of this notice
Address: 76 Beaconsfield Place, Aberdeen, AB15 4AJ
Proposal: Complete Demolition in a Conservation Area (Single Garage)
Applicant: Mr Brad Hatcher
Ref No: 161056/CAC
(Would Community Councils, conservation groups and societies, applicants and members of the public please note that Aberdeen City Council as planning authority intend to accept only those representations which have been received within the above periods as prescribed in terms of planning legislation. Letters of representation will be open to public view, in whole or in summary according to the usual practice of this authority).
Date: 12/08/16
HEAD OF PLANNING AND SUSTAINABLE DEVELOPMENT