Pipe-Lines
PETROLEUM ACT 1998
NOTICE OF THE ISSUE OF A SUBMARINE PIPELINE WORKS AUTHORISATION
The North Sea Transition Authority gives notice that it has decided to issue, and in consequence has issued, a works authorisation to be held by Anasuria Hibiscus UK Limited whose address is Cannon Street, London, EC4N 6AF for the construction and use of a system of pipelines between the VP5 Production Well and Anasuria FPSO ESDV and the Anasuria FPSO TUTU and Teal West Control Umbilical.
The North Sea Transition Authority (NSTA) is the business name of the Oil and Gas Authority (OGA). The OGA remains the legal name of the company. References in this notice to the NSTA should be interpreted as the OGA.
Except with the consent of the NSTA, the 244.4 Millimetre Production Flowline shall only be used to convey produced fluids; and the 148.8 Millimetre Services umbilical shall only be used to convey Wax inhibitor, Hydraulic fluid, Methanol, and Power/Signal.
The pipelines may be used by the Holder and with the Holder's agreement, and with the consent of the NSTA, by other persons.
Anasuria Hibiscus UK Limited have been appointed operator of the pipelines.
Andrew Carle
The Oil and Gas Authority
