The County of PembrokeshireThe County of Cornwall-2.09971957.144441AB11 6AR-1.44033855.007380NE30 1LJ0.59424550.856010TN34 3DWThe Borough of North East Lincolnshire2006-06-23TR185JRDN313QLTQ58AWNR321BNYO111PDSA733LSNE301LJAB116ARTN343DWSW1H9BPPL40LH2006-05-22-4.13148950.367065PL4 0LH1.75174152.473993NR32 1BN-0.39208054.283357YO11 1PDThe Borough of Hastings-0.06774753.582425DN31 3QL-5.54668350.101611TR18 5JRThe Borough of North Tyneside-5.04340351.715327SA73 3LS-0.13162751.500502SW1H 9BPThe Borough of TorbayPetroleum Act 1998PETROLEUM ACT 1998The City of WestminsterThe City of Plymouth-3.51314450.397243TQ5 8AWThe District of WaveneyAberdeen CityThe Borough of ScarboroughTSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk57988809809

Newfield Petroleum UK Limited

PETROLEUM ACT 1998
NOTICE OF APPLICATION FOR A SUBMARINE PIPELINE WORKS AUTHORISATION

Newfield Petroleum UK Limited hereby gives notice, in accordance with the provisions of part I of Schedule 2 to the Petroleum Act 1998 that it has made an application to the Secretary of State for Trade and Industry for the grant of an authorisation for the construction and use of a system of pipelines between the proposed Grove Normally Unmanned Installation (NUI) in UK Block 49/10 a to a proposed riser platform adjacent to the existing Markham J6-A platform in Block J6 of the Dutch sector and between the proposed Grove West subsea well and the proposed Grove NUI. A map (or maps) delineating the route of the proposed pipelines and providing certain further information may be inspected free of charge at the places listed in the Schedule to this notice from 10.00 am to 4.00 pm on each weekday from the date that this notice is published until the date mentioned in the next paragraph of this notice. Pursuant to a direction of the Secretary of State, representations with respect to the application may be made in writing and addressed to the Secretary of State for Trade and Industry at the Department of Trade and Industry, ERDU-LED, Atholl House, 86-88 Guild Street, Aberdeen, AB11 6AR (marked FAO Mrs Chris Kelly, Offshore Pipeline Authorisations) not later than 23 June 2006 and should bear Ref RDBC/001/000259C and state the grounds upon which the representations are made. R M Saxby, Company Secretary Newfield Petroleum UK Limited, First Floor, 21 Dartmouth Street, London SW1H 9BP. Schedule Places where a map or maps may be inspected

Newfield Petroleum UK Limited First Floor 21 Dartmouth Street London SW1H 9BP Department of Trade & Industry Energy Group 3rd Floor, Atholl House 86-88 Guild Street Aberdeen AB11 6AR
DEFRA Fisheries Office 20 West Pier Scarborough North Yorkshire YO11 1PD DEFRA Fisheries Office The Quay Poole Dorset BN15 1HP
DEFRA Fisheries Office Fish Quay Sutton Harbour Plymouth Devon PL4 0LH DEFRA Fisheries Office Estuary House 1 Wharncliffe Road Grimsby Lincolnshire DN31 3QL
DEFRA Fisheries Office 46 Fore Street Newlyn Penzance TR18 5JR DEFRA Fisheries Office New Fish Quay Brixham Devon TQ5 8AW
DEFRA Fisheries Office Fish Market Rock-a-Nore Road Hastings East Sussex TN34 3DW DEFRA Fisheries Office Baltic Chambers 2 Waveney Road Lowestoft Suffolk NR32 1BN
DEFRA Fisheries Office Neville House Central Riverside Bell Street North Shields Tyne and Wear NE30 1LJ DEFRA Fisheries Office Suite 3 Cedar Court Havens Head Business Park Milford Haven Pembrokeshire SA73 3LS
DEFRA Fisheries Office Bradleys Chambers 26 London Street Fleetwood Lancashire FY7 6JG
Technical Annex At the request of the Secretary of State for Trade and Industry, and as agreed by the Health and Safety Executive, Newfield Petroleum UK Limited presents the following information about the Grove Development: Pre-Commissioning Testing The pipeline will be tested to the satisfaction of the Health and Safety Executive prior to commissioning. Design Pressure The pipeline will not be operated at a pressure greater than that for which it has been designed. Leak Detection Flow of fluids through the pipeline will be monitored to enable the detection of leaks at all times. In the event of a leak being detected the location and significance of the leak will be established and steps will be taken to bring the leak under control as soon as possible. In the event of a leak likely to harm persons or the environment being confirmed then Emergency Action will be taken. Routine surveillance will be carried out along the pipeline route. Emergency Action In the event a major release from the pipeline occurs the following emergency action will be taken: All fluid delivery into the pipeline will be manually or automatically stopped. The Health & Safety Executive will be notified by the quickest practical means. A survey will be carried out to determine the location of the release and remedial pipeline works will be undertaken as necessary. Should pollution result from the discharge, the Newfield Petroleum UK Limited’s Oil Spill Contingency Plan will be implemented. If necessary, the emergency pollution control system held in constant readiness by the UK Offshore Operators Association will be mobilised. Recommissioning In the event of a pipeline break, repairs and integrity proving will be carried out as agreed with the Health and Safety Executive before returning the pipeline to use. On Bottom Stability and Safety The pipeline will be laid in a manner that will ensure its safety and stability and the safety of users of the sea under all reasonably foreseeable conditions. Limits of Deviation The pipeline will be laid within a boundary of 100 metres on either side of the proposed route.