Electricity
2008-09-05E145JJThe London Borough of Tower Hamlets-0.01690251.502619E14 5JJTSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211,
customer.services@tso.co.uk70122103/202103/20
firmus energy
Application for a private electricity supply licence
1. | Full name of the applicant(s): |
| firmus energy (supply) limited |
2. | Address of the applicant(s) or, in the case of a body corporate, the registered or principal office. |
| Business address – Kilbegs Business Park, Antrim, Northern Ireland, BT41 4NN |
| Registered office – 10 Upper Bank Street, London, E14 5JJ |
3. | Where the applicant is a company, the full names of the current Directors and the company’s registered number. |
| Dave Kirwan (Chairman) Michael G. O’Sullivan Pierce O’Hanrahan Reg. no. 5369108 |
4. | Where a holding of 20 per cent, or more of the shares (see Note) of an applicant is held by a body corporate or partnership or an unincorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided. |
| firmus energy (supply) is a wholly owned subsidiary of firmus energy (Distribution) Limited (which in turn is a wholly owned subsidiary of Bord Gais Eireann, Gasworks Road, Cork, Ireland). |
(a) | annual forecasts of costs, sales and revenues and project financing stating the assumptions underlying the fixtures provided; |
(b) | detailed map or maps to a scale sufficient to show clearly– |
(i) | the area to which a the application relates; |
(ii) | the distribution system above 11kV, showing overhead lines, cable routes and associated substations; and |
(iii) | which lines, cables and substations are to be constructed and which are already in existence; |
(c) | single line diagram of the distribution system showing what is to be constructed and what is already in existence. |
| N/A |
5. | Details of any expected subsequent substantial capital outflows including major decommissioning costs. |
| N/A |
6. | Estimates of net annual cash flows for subsequent periods sufficient to demonstrate the financial security and feasibility of the project(s) to which the application relates. |
As documented in Part 2 | |
7. | A list of the names and addresses of customers to be supplied. |
Unspecified customer details to date Phase 1: 10 towns (firmus energy franchise area) large IC customers Phase 2: other NI large IC customers Phase 3: small IC users Phase 4: domestic users | |
8. | A statement of the extent (if any) to which the applicant considers it necessary for powers under Schedule 3 (compulsory acquisition of land etc,) and under Schedule 4 (other powers etc.) to the Order to be given throught the licence for which he is applying, together with a statement of any specific purposes for which those powers are felt to be necessary. |
| N/A |
9. | Details of any licences held, applied for or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity. |
no licences held for electricity firmus energy holds 2 gas supply licences and 1 gas distribution licence | |
NOTE | |
References to shares– | |
(a) | in relation to an applicant with a share capital, are to allotted shares; |
(b) | in relation to an applicant with capital but no share capital, are to rights to share in the capital of the applicant; |
(c) | in relation to an applicant without capital, are to interests– |
(i) | conferring any right to share in the profits or liability to contribute to the losses of the applicant; or |
(ii) | giving rise to an obligation to contribute to the debts or expenses of the applicant in the event of a winding up. |