-2.44004050.716339DT1 1XJElectricity Act 1989-0.13094951.498773SW1H 0ET-2.38111253.426799M31 4BH2018-01-162018-02-202018-01-23The District of West DorsetThe City of Westminster-2.43879950.715426DT1 1UZThe Borough of TraffordElectricity Act 1989, s. 37TSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk295203762181

National Grid Electricity Transmission

OVERHEAD LINE, WINTERBOURNE ABBAS, DORSET

NOTICE OF APPLICATION FOR CONSENT TO REPLACE A SHORT SECTION OF 400KV OVERHEAD LINE IN THE AREA OF WEST DORSET DISTRICT COUNCIL

Notice is hereby given that National Grid Electricity Transmission plc (National Grid) intends to make an application under Section 37 of the Electricity Act 1989 for the consent of the Secretary of State for Business, Energy and Industrial Strategy for the replacement of a short section of 400kV overhead line to connect to a proposed new sealing end compound (SEC) at Winterbourne Abbas.

The overhead line replacement is required to facilitate the Visual Impact Provision (VIP) Project. The overall project comprises the following main elements:

• Installation of approximately 8.8km of 400kV underground cables;

• Construction of two cable sealing end compounds (SECs) including permanent access roads, required to connect the new underground cables to the existing overhead line;

• Dismantling and permanent removal of 8.25km of 400kV overhead line including 22 pylons;

• Temporary works to facilitate road works and construction access;

• Replacement of one terminal pylon and approximately 0.6km of new 400kV overhead line (separate consent under s37 of the Electricity Act)

The proposed replacement 400kV overhead line would be approximately 153m in length and deviate approximately 68m from the existing overhead line.

A copy of the application with a plan (PDD-33495-LAY-057 rev02) showing the land to which it relates, together with a copy of the Environmental Statement, explaining the proposals in more detail and presenting an analysis of the environmental implications and a Non Technical Summary thereof, along with other supporting documentation can be viewed on West Dorset District Council’s website at:

http://webapps.westdorset-weymouth.gov.uk/PlanningApps/Pages/Search.aspx

Search using application reference WD/D/18/000041

The application has also been deposited for public inspection in the following locations:

West Dorset District Council

Planning Department

South Walks House

South Walks Road

Dorchester

DT1 1UZ

Dorset County Council

Planning Department

County Hall,

Colliton Park,

Dorchester,

DT1 1XJ

Any person wishing to object to this application should send particulars of such objection to The Secretary of State for Business, Energy and Industrial Strategy, c/o Denise Libretto, Energy Infrastructure Planning, the Department for Business, Energy and Industrial Strategy, Level 3, Orchard 2, 1 Victoria Street, London, SW1H 0ET or by email to denise.libretto@beis.gov.uk so as to reach him not later than 20th February 2018, identifying the name of the overhead line and the grounds for objection. It is requested that any such representations also be sent to the undersigned:

National Grid

Daines Substation

Isherwood Road

Carrington M31 4BH

Andrea Key

Consents Officer

National Consents Team

National Grid Electricity

Transmission plc

andrea.key@nationalgrid.com

Dated this 16th January 2018