Pipe-Lines

PETROLEUM ACT 19982016-02-19The City of Westminster-0.13851651.516717W1W 8DHTSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk248261227680

PETROLEUM ACT 1998

NOTICE OF THE ISSUE OF A SUBMARINE

PIPELINE WORKS AUTHORISATION

The Secretary of State for Energy and Climate Change hereby gives notice that she has decided to issue, and in consequence has issued, a works authorisation to be held by Apache Beryl I Limited whose address is 27-28 Eastcastle Street, London, W1W 8DH for the construction of a pipeline system between Beryl Bravo Platform and Nevis Production Well 9/13b-69.

Except with the consent of the Secretary of State, the 168.3 millimetre production pipeline shall be only used to convey Produced Fluids; the 168.3 millimetre gas lift pipeline shall be only used to convey Gas Lift and the 130 millimetre services umbilical shall be only used to convey Hydraulics, Scale/Corrosion Inhibitor, Hydrate Inhibitor and Power/Signal.

The pipelines may be used by the holder and with the holder’s agreement, and with the consent of the Secretary of State, by other persons.

Apache Beryl I Limited have been appointed operators of the pipelines.

Andrew Carr

Field Development Manager

OGA Aberdeen